Charge Point Operator · Founded 2018

Charging infrastructure, delivered end to end.

Electra Hub designs, permits, installs, and operates commercial EV charging for property owners and fleets — at zero upfront cost. One partner from the first site visit to a fully operational, revenue-sharing station.

30
Sites installed & operating
2018
Founded & operating since
DTE + CE
Recognized utility installer
50–500kW
Fast charging we deploy
The Electra Hub model

Three layers, one accountable partner.

Most charging projects break because the pieces are handled by different companies. We own all three layers — so there's one team responsible from the ground up to the day-to-day.

Layer 01

Infrastructure

The groundwork, done right. Trenching, conduit, panels, and service upgrades — engineered and built by licensed electricians to NEC standards.

Layer 02

Hardware

The right charger for your site. We deploy 50–500kW fast charging that can add a full charge in as little as 15 minutes — with the exact configuration matched to your property when we meet with you.

Layer 03

Operations

Kept running, long-term. 24/7 monitoring, maintenance, and support through our own Electra Hub platform. Uptime is the product.

Deployment lifecycle

From first site visit to fully operational, in six phases.

PHASE 01

Feasibility

Site assessment, electrical capacity, and whether your property qualifies for zero-cost installation.

PHASE 02

Design & Engineering

Layout, load calculations, and structural planning drawn to NEC standards.

PHASE 03

Utility Coordination

Interconnection applications and make-ready work with DTE Energy and Consumers Energy.

PHASE 04

Incentives & Funding

We identify the tax credits, grants, and rebates your project qualifies for and fold them in.

PHASE 05

Construction

Civil and electrical work performed by our licensed crews, then charger installation and commissioning.

PHASE 06

Operations

Go-live, then ongoing monitoring, maintenance, and support for the life of the site.

Who we build for

Charging built for your kind of property.

Retail & Grocery

Turn dwell time into charging time and draw EV drivers to your storefront.

Fleet & Logistics

Depot charging sized to your duty cycles and vehicle turnaround.

Multifamily

Resident and visitor charging that adds a modern amenity to your property.

Hospitality

Give guests a reason to choose you, and to stay longer while they charge.

Municipal & Public

Reliable public access charging that serves your community and corridors.

Workplace & Campus

Charging for employees and visitors that supports your sustainability goals.

Zero upfront cost

We cover the project. You share the upside.

Electra Hub covers project costs in exchange for a revenue share — so you can offer charging without the capital outlay. Available incentives can cover a significant amount of the project cost, and we handle finding and applying them.

Federal tax credits

We identify and document the federal incentives your project is eligible for.

State grants

Michigan and program-specific grant funding, tracked and applied on your behalf.

Utility make-ready

DTE and Consumers Energy make-ready programs that offset infrastructure cost.

Revenue share

You earn a share of ongoing charging revenue — paid on a predictable schedule.

Network overview Live
99.2%
Network uptime
1,480
Sessions / mo
42 MWh
Energy delivered
30
Sites online
Utilization by sitethis week

Illustrative dashboard — sample figures.

Real-time operations

Every site, visible in real time.

Once a site is live, our own Electra Hub platform monitors uptime, sessions, energy delivered, and utilization across the network — so issues are caught early and every charger keeps earning.

See our software & app

See if your property qualifies for zero-cost EV charging.

Get a free site assessment — no cost, no obligation, just a straight answer on whether your site is a fit.

Start with a site assessment