Electra Hub designs, permits, installs, and operates commercial EV charging for property owners and fleets — at zero upfront cost. One partner from the first site visit to a fully operational, revenue-sharing station.
A look at what runs behind an Electra Hub site — energy flowing, batteries filling, and revenue counting, all in real time.
Most charging projects break because the pieces are handled by different companies. We own all three layers — so there's one team responsible from the ground up to the day-to-day.
The groundwork, done right. Trenching, conduit, panels, and service upgrades — engineered and built by licensed electricians to NEC standards.
The right charger for your site. We deploy 50–500kW fast charging that can add a full charge in as little as 15 minutes — with the exact configuration matched to your property when we meet with you.
Kept running, long-term. 24/7 monitoring, maintenance, and support through our own Electra Hub platform. Uptime is the product.
From overnight destination charging to high-power fast charging, fleets, and the software that ties it all together.
For hotels, offices, and multifamily, where cars sit for hours. Turn parked time into charged time.
High-power DC fast charging for retail, corridors, and public sites — a full charge in as little as 15 minutes.
Depot charging built around your duty cycles — load balancing, departure windows, and energy controls.
The management layer over every site — monitoring, pricing, diagnostics, and uptime across your network.
See how the software works on our platform & app page.
Site assessment, electrical capacity, and whether your property qualifies for zero-cost installation.
Layout, load calculations, and structural planning drawn to NEC standards.
Interconnection applications and make-ready work with DTE Energy and Consumers Energy.
We identify the tax credits, grants, and rebates your project qualifies for and fold them in.
Civil and electrical work by our licensed crews, then charger installation and commissioning.
Go-live, then ongoing monitoring, maintenance, and support for the life of the site.
Turn dwell time into charging time and draw EV drivers to your storefront.
Depot charging sized to your duty cycles and vehicle turnaround.
Resident and visitor charging that adds a modern amenity to your property.
Give guests a reason to choose you, and to stay longer while they charge.
Reliable public access charging that serves your community and corridors.
Charging for employees and visitors that supports your sustainability goals.
Electra Hub covers project costs in exchange for a revenue share — so you can offer charging without the capital outlay. Available incentives can cover a significant amount of the project cost, and we handle finding and applying them.
We identify and document the federal incentives your project is eligible for.
Michigan and program-specific grant funding, tracked and applied on your behalf.
DTE and Consumers Energy make-ready programs that offset infrastructure cost.
You earn a share of ongoing charging revenue — paid on a predictable schedule.
Illustrative dashboard — sample figures.
Once a site is live, our own Electra Hub platform monitors uptime, sessions, energy delivered, and utilization across the network — so issues are caught early and every charger keeps earning.
See our software & appWe cover the project costs — engineering, permitting, equipment, and installation — in exchange for a share of the charging revenue. You get charging on your property without the capital outlay.
We deploy 50–500kW fast charging. At the high end, a fast charger can add a full charge in as little as 15 minutes. The exact speed depends on your site's power and the vehicle — we match the right configuration to your property.
No. We operate and maintain the site for its lifetime — monitored 24/7 through our own Electra Hub platform, with preventive maintenance and repairs handled by us.
We're a recognized installer working directly with DTE Energy and Consumers Energy, and we manage the entire utility process — load studies, interconnection, and make-ready programs — on your behalf.
Most projects run about 12–16 weeks from assessment to go-live. Utility timelines are usually the biggest variable, and we manage them for you.
Get a free site assessment — no cost, no obligation, just a straight answer on whether your site is a fit.