About Electra Hub

Engineers who build charging that actually stays on.

Electra Hub delivers fast, reliable EV charging. We own and operate our own network of fast-charging stations, and we design and install turnkey charging on other properties — managing the full process end to end.

Our mission

Electra Hub makes it possible for any property owner to offer EV charging with zero upfront cost and zero operational burden — we design, permit, install, and operate the entire system, and share in the results.

Our story

Founded in 2018 by two engineers.

Electra Hub was started in 2018 in Metro Detroit by two engineers — one electrical, one mechanical — who saw the same problem from both sides: EV charging isn't a technology problem, it's an execution problem. Too many stations were installed and then abandoned.

So we built a company that does all of it — engineering, design, electrical work, installation, permitting, and long-term operation — with the discipline you'd expect from engineers. Today we own and operate 30 charging sites, and we bring that same end-to-end approach to turnkey installs on other properties.

Electra Hub
What sets us apart

Expertise, commitment, and a long view.

Expertise

Engineer-led, code-driven work. Licensed crews and installations built for safety, reliability, and long-term performance.

Commitment

We cover project costs and share in the results — so our incentives are tied to your site actually working, for years.

Vision

Building a charging network people can count on, one reliable, well-run site at a time.

Core commitments

How we work, every project.

Honest assessments over false promises
Long-term uptime over a fast install
One accountable point of contact
Code compliance over schedule pressure
Trust & credibility

Built to code, backed by a track record.

30 sites operating

Thirty charging sites installed and operating across our network — real proof, not projections.

Utility partnerships

A recognized installer working directly with DTE Energy and Consumers Energy.

Code & permitting

Every install follows NEC standards and local AHJ permitting requirements.

Let's put charging on your property.

Zero upfront cost, zero operational burden. See if your site qualifies.

Get a free site assessment